All projects
PROJECT 03 / 03 · REHABILITATION

Al-Karkh Dewatering Rehabilitation

Sludge Dewatering — Rehabilitated sludge line running 4 high-capacity decanter centrifuges.

Al-Karkh Dewatering Rehabilitation

Capacity

4x DEC UNITS

Location

BAGHDAD, IRAQ

Period

2023

Client

Baghdad Mayoralty

Project overview

Ageing sludge handling equipment caused frequent breakdowns, high haulage volumes and odour complaints from surrounding districts.

WETIA integrated four Vitone ECO high-capacity decanter centrifuges with automated polymer dosing and enclosed cake conveyance, replacing the obsolete belt presses.

Key deliverables
  • 014 high-capacity decanter centrifuges installed
  • 02Significant reduction in sludge haulage volume
  • 03Enclosed handling reduces odour emissions
  • 04Automated polymer dosing lowers chemical use

Delivery timeline

  1. PHASE 01

    Assessment

    Site surveys, influent characterisation and feasibility modelling.

  2. PHASE 02

    Engineering

    Process design, P&IDs, civil and electrical detail engineering.

  3. PHASE 03

    Procurement

    European equipment sourcing, factory testing and logistics.

  4. PHASE 04

    Construction

    Civil works, mechanical installation and integration.

  5. PHASE 05

    Commissioning

    Performance testing, operator training and handover.

WETIA

Complete turn-key municipal and industrial water treatment engineering solutions across Iraq and the wider MENA region.

Mission Statement

“Complete water treatment, from requirement to operation.”

Legal & Compliance

  • Cookie Policy
  • Terms & Conditions
  • Privacy Policy
  • Compliance & QHSE

Global Presence

Baghdad Headquarters

Al-Jadriya District, Area 913, Baghdad, Iraq

+964 (0) 790 190 0000

Milan Technical Office

Via Monte Napoleone 8, 20121 Milano, Italy

info@wetia-water.com

Certified Standards

ISO 9001ISO 14001ISO 45001

© WETIA. All rights reserved. Water Treatment & Environmental Infrastructure EPC.