PROJECT 02 / 03 · SWRO

Industrial Port Reverse Osmosis Facility

Seawater Desalination — 20,000 m³/day of dual-pass reverse osmosis process water supplied to the port facility.

Industrial Port Reverse Osmosis Facility

Capacity

20,000 m³/day

Location

UMM QASR, IRAQ

Period

2021 – 2023

Client

Industrial port operator

Project overview

The port relied on trucked water of inconsistent quality, limiting boiler operation and industrial processes on site.

We engineered a seawater intake with multi-stage pre-filtration feeding dual-pass reverse osmosis trains, energy recovery devices and automated chemical cleaning.

Key deliverables
  • 0120,000 m³/day of process-grade water
  • 02Energy recovery cutting power use per m³
  • 03Elimination of trucked water supply
  • 04Remote monitoring of all RO trains

Delivery timeline

  1. PHASE 01

    Assessment

    Site surveys, influent characterisation and feasibility modelling.

  2. PHASE 02

    Engineering

    Process design, P&IDs, civil and electrical detail engineering.

  3. PHASE 03

    Procurement

    European equipment sourcing, factory testing and logistics.

  4. PHASE 04

    Construction

    Civil works, mechanical installation and integration.

  5. PHASE 05

    Commissioning

    Performance testing, operator training and handover.

WETIA

Complete turn-key municipal and industrial water treatment engineering solutions across Iraq and the wider MENA region.

Mission Statement

“Complete water treatment, from requirement to operation.”

Legal & Compliance

  • Cookie Policy
  • Terms & Conditions
  • Privacy Policy
  • Compliance & QHSE

Global Presence

Baghdad Headquarters

Al-Jadriya District, Area 913, Baghdad, Iraq

+964 (0) 790 190 0000

Milan Technical Office

Via Monte Napoleone 8, 20121 Milano, Italy

info@wetia-water.com

Certified Standards

ISO 9001ISO 14001ISO 45001

© WETIA. All rights reserved. Water Treatment & Environmental Infrastructure EPC.