Seawater Desalination — 20,000 m³/day of dual-pass reverse osmosis process water supplied to the port facility.
Capacity
20,000 m³/day
Location
UMM QASR, IRAQ
Period
2021 – 2023
Client
Industrial port operator
The port relied on trucked water of inconsistent quality, limiting boiler operation and industrial processes on site.
We engineered a seawater intake with multi-stage pre-filtration feeding dual-pass reverse osmosis trains, energy recovery devices and automated chemical cleaning.
PHASE 01
Assessment
Site surveys, influent characterisation and feasibility modelling.
PHASE 02
Engineering
Process design, P&IDs, civil and electrical detail engineering.
PHASE 03
Procurement
European equipment sourcing, factory testing and logistics.
PHASE 04
Construction
Civil works, mechanical installation and integration.
PHASE 05
Commissioning
Performance testing, operator training and handover.