All projects
PROJECT 01 / 03 · PHASE 2

Basra Municipal Central WWTP Phase 2

Municipal Wastewater — 45,000 m³/day of municipal secondary treatment capacity under automated SCADA supervision.

Basra Municipal Central WWTP Phase 2

Capacity

45,000 m³/day

Location

BASRA, IRAQ

Period

2022 – 2024

Client

Basra Municipal Authority

Project overview

Rapid population growth had pushed the existing plant far beyond its design load, with untreated overflow reaching the Shatt al-Arab during peak summer months.

WETIA delivered a turnkey phase-2 expansion: new secondary clarifiers, activated-sludge biological reactors and a plant-wide SCADA system, built in phases so the existing plant stayed online throughout.

Key deliverables
  • 0145,000 m³/day additional treatment capacity
  • 02Effluent compliant with national discharge limits
  • 03Zero unplanned shutdowns during construction
  • 0424/7 automated SCADA supervision

Delivery timeline

  1. PHASE 01

    Assessment

    Site surveys, influent characterisation and feasibility modelling.

  2. PHASE 02

    Engineering

    Process design, P&IDs, civil and electrical detail engineering.

  3. PHASE 03

    Procurement

    European equipment sourcing, factory testing and logistics.

  4. PHASE 04

    Construction

    Civil works, mechanical installation and integration.

  5. PHASE 05

    Commissioning

    Performance testing, operator training and handover.

WETIA

Complete turn-key municipal and industrial water treatment engineering solutions across Iraq and the wider MENA region.

Mission Statement

“Complete water treatment, from requirement to operation.”

Legal & Compliance

  • Cookie Policy
  • Terms & Conditions
  • Privacy Policy
  • Compliance & QHSE

Global Presence

Baghdad Headquarters

Al-Jadriya District, Area 913, Baghdad, Iraq

+964 (0) 790 190 0000

Milan Technical Office

Via Monte Napoleone 8, 20121 Milano, Italy

info@wetia-water.com

Certified Standards

ISO 9001ISO 14001ISO 45001

© WETIA. All rights reserved. Water Treatment & Environmental Infrastructure EPC.