Municipal Wastewater — 45,000 m³/day of municipal secondary treatment capacity under automated SCADA supervision.
Capacity
45,000 m³/day
Location
BASRA, IRAQ
Period
2022 – 2024
Client
Basra Municipal Authority
Rapid population growth had pushed the existing plant far beyond its design load, with untreated overflow reaching the Shatt al-Arab during peak summer months.
WETIA delivered a turnkey phase-2 expansion: new secondary clarifiers, activated-sludge biological reactors and a plant-wide SCADA system, built in phases so the existing plant stayed online throughout.
PHASE 01
Assessment
Site surveys, influent characterisation and feasibility modelling.
PHASE 02
Engineering
Process design, P&IDs, civil and electrical detail engineering.
PHASE 03
Procurement
European equipment sourcing, factory testing and logistics.
PHASE 04
Construction
Civil works, mechanical installation and integration.
PHASE 05
Commissioning
Performance testing, operator training and handover.